State how much it cost, in today’s dollars using an Internet “inflation calculator”

For one of the following historic infrastructure projects (list below), (1) describe the project and explain why it was needed; (2) If possible, state how much it cost, in today’s dollars using an Internet “inflation calculator”; (3) list its beneficial and negative effects; (4) explain the role of new technology; (5) list ways it affected people; (6) describe the role of government (federal, state, local) in the project. This needs to be at least one page (Times 12 font, 1in margins) and the maximum 2 pages.

Projects:
• St. Lawrence Seaway
• China’s Grand Canal
• Paris historic sewer system
• New York City’s historic water treatment and distribution system
• Brooklyn Bridge
• Cloaca Maxima
• Severn Tunnel
• Hoover Dam
• Machu Picchu irrigation system
• London Bridge
• Transcontinental Railroad
• Trans-Alaska pipeline
• “Chunnel”
• Empire State Building
• Three Gorges Dam
• Taweelah A1 Power and Desalination Plant